Lee Lewis Construction, Inc. has a long history working together with Frenship ISD, and we have consistently provided services for their last 4 Bond programs; Bond...
This project consisted of new ground up construction for Anna ISD’s 2nd Middle School. During the scope of the project, this Middle School was named Clemons...
Phase 1 includes a CTE wing and renovations to existing spaces, including administrative office upgrades and a classroom conversion to a ninth grade wing. A new...
Shelton School is an academic institution currently serving over 800 students, preschool through 12th grade. Upon relocation to the repurposed campus (formerly a State Farm Call...
The new Balmorhea K-12 School sits on 76 acres and is all in one building and will house 150 students from Pre-Kindergarten through 12th grade. The...
As part of the Eden ISD Bond Program, a new K-12 school was built for the current 230 students. In addition to grade level classrooms, the...
This Elementary school exemplifies how open and flexible spaces can create an ideal environment for collaboration and active learning. Student engagement flourishes with the integration of...
This new elementary school is bridging the gap between maintaining equality with the existing elementary schools in the district and the future of Anna ISD. The...
GCISD’s new Cannon Elementary School is designed for STEM and project-based learning. Aesthetically, the design aligns with secondary education facilities. Functionally, everything moves, creating an environment...
Frisco’s seventh high school is a two story structure, including academic areas as well as spaces for fine arts, a 600 seat auditorium, food service, dining,...